Project Description
Plant Vogtle Units 3 & 4 | Cooling Tower Foundation & Hot Water Intake Tunnels
LOCATION: Waynesboro, GA
OWNER: Georgia Power Company
PROJECT SCOPE:
- Excavate 250,000 cy 30’ depths for tunnel construction
- Install 56- 6’ diameter caissons 120’depth
- Form & pour 2- 20’ x 20’ box culverts 275’ long
- Poured 9,600 cy of concrete
- Utilized 1,100 tons of rebar
- Installed concrete pile caps
- 90,000 cy of structural backfill