Project Description

Komatsu Training Facility

LOCATION: Cartersville, GA
OWNER: Komatsu America Corporation

PROJECT SCOPE:

Repaired a failing parking lot and built a newly designed equipment construction area.  Existing parking lot had been built over unstable organic material, CAM removed existing parking lot, excavated 135,000 CY of failed fill and replaced with a geo-grid reinforced engineered fill to stabilize sub-grade and slope. CAM moved an additional 850,000 CY of dirt and rock to build the new heavy equipment demonstration area.  Installed approximately 6,000 LF of storm pipe ranging from 18” to 60” and place 8,5000 TN of GAB for a 2400 LF haul road. During the course of the project 27,000 LF of silt fence was installed as well as 8,000 LF of French drain. There was also 180,000 SY of erosion matting installed.